Sunday, March 27, 2011

More exterior photos

It's a little difficult to quantify what has been done over the last week, so I thought I'd mostly just put up some old photos of the exterior as it has occurred to me that there are not actually that many on here!  I think that we took so many that I felt as thought I'd posted a lot.

Regan has continued with the never-ending task of painting.  He's almost been doing it for three months now. He's on to the ceiling of the kitchen/dining room now.  I brought down the coffee after he'd been sanding for the morning and those bits of his face that had not been covered by the air filter were covered in dust.  The first top coat is on now, which is great.  He's also primed Bedroom 2.  Slowly but surely, we're getting there.

The kitchen has not gone in yet.  Somehow I'm not surprised.  But the Builder is working hard at it.  Maybe next week...

My contribution: lunch prepared on site
The builder has also been putting in more of the doors in the storage wall, so that is looking more like a continuous wall now, as it is meant to.  He's also been doing general finishing work, which is always difficult to describe.  It is all feeling very near but very far at the moment!

Sunday, October 31, 2010

Gib bracing has commenced

Ensuite on left, gibbed masterbed on right
The builder has been busy on the interior this week.  He has put up the gib board over the pink batt-filled walls in the master bedroom to act as the bracing.  We are not lining the walls with gib - we are lining them with MDF (gib is "too obvious").  So the MDF will go on top of the bracing gib. 

The plumber has also dropped all sorts of things off.  Our bath is now on site!  It is being stored in the en-suite for the moment, but it will eventually go into the main bathroom.  From the looks of things, the plumber had to have two goes at cutting the plug hole into the concrete in the main bathroom...  The en-suite seems to be being used as a general storage area at the moment!  The plumber has also delivered the taps, so they are being stored in the garage.  The toilets and basins are still in our garage at home!  We're feeling rather overwhelmed with house bits at home at the moment.  The hallway at home, for example, is piled high with light fittings.

Gib stored in the lounge
All of the bracing gib has been delivered, and it is piled up in the lounge.  It is pretty thick stuff, and the weight of it all in one place is so great that they have had to prop the garage again so that our concrete floor doesn't crack or bow.

The metal ceiling battens have also been delivered, and they are stored in the dining room/kitchen.  So the lining is starting to happen, which is pretty exciting.  I understand that the gib bracing will go up first, then the ceilings, and then the MDF.  And somewhere in all of this, Regan needs to sort out some acoustic panels for the ceiling....  

Macrocarpa outside the kitchen
The builder has also continued work on the cladding, and has put up the macrocarpa cladding outside the kitchen.  That big framed window is a huge picture window in the kitchen.  The dining area is to the right, and the outside area will eventually be a courtyard.

 That macrocarpa wall is a continuation of the wall that you can see outside next to the master bedroom in the exterior shots from the last post.  It continues all the way through the house along the same line, and finishes here outside the kitchen.  The interior bits of it haven't been done yet.

Ray, Regan, Scott and ceiling battens 
Scott is visiting from Brisbane, so we took advantage of the situation to put him to work as another electrician's apprentice, and he, Ray and Regan did some wiring on Saturday.  Exactly how much was done is questionable, as I had a long telephone conversation with my mother, did the groceries, brought them a late lunch and then got home at 4 pm and they hadn't done anything yet...





Sunday, October 17, 2010

Macrocarpa cladding starts


The macrocarpa cladding on the house has begun!  You can see it on the front of the house, between the dining/kitchen (on the left) and the lounge (on the right).  (You can just see the bedroom wing sticking out behind the lounge.)  And you can see that the garage door has gone in (underneath the lounge).  The front door is just next to that.

Some of the window soffits have also got macrocarpa cladding around them - like the big picture window on the east side of the kitchen, so some of that has started too.
Some more plywood cladding has also gone on the bit of the house that extends out into the outdoor courtyard.  You can see some plywood, and then black beneath it.  We are going to have to bring in some more fill to bring the ground level up so that the ground starts at the bottom of the plywood area.  It turns out that the level is a little lower than anticipated!  In the photo on the right, Regan is standing in the north east corner of the dining room.

And the sparkies haven't been idle either.  As you can see, there are now acres and acres of wire lying around...