Good Foundations
The first lot of foundations are in! Look at that lovely solid snake of gray. And obviously all the blocks are on site. So the 6 pallets closest to us are in the garage, which will have the lounge and library above it. The next block by itself is in the future stairwell, and the remainder are in the car port (the kitchen/dining will be above that). So that is the space covered by the V shape in the image up top.
And the blue truck in the distance belongs to our neighbours two sites down, who have just started excavating. The site two sites up is up to roof framing. So nothing for two years and now suddenly it is all go.